| MOQ: | 10 tons |
| Price: | USD 790 - 950 per ton FOB Tianjin |
| Standard Packaging: | VCI anti-rust paper, plastic film, hessian cloth, wooden pallet, steel strap |
| Delivery Period: | 15 - 20 days after deposit |
| Payment Method: | T/T 30% deposit, balance against B/L copy; L/C at sight accepted |
| Supply Capacity: | 3000 tons per month |
A chain link weaving line stops every time a coil runs out, and on a machine producing 2.5 mm mesh the changeover plus re-threading can cost fifteen to twenty minutes. Big coil galvanized wire wound as a single 1000 kg continuous length at 1200 mm outer diameter cuts that downtime by a factor of five compared with 100 kg coils, which is why fence factories running double shift ask for this format specifically. The requirement is not just weight: the coil has to be wound without welds, without cross-overs, and with a consistent tension so the payoff does not slap or birdsnest at speed.
We wind these coils on a tension controlled layer winder, weld free across the full 1000 kg, and check the payoff behaviour on a sample before the lot is released. Wire diameter is held to +/- 0.05 mm across the length because a drift at the last 200 kg will show up as a mesh width change that the machine cannot compensate for.
Key Features| Parameter | Specification |
|---|---|
| Coil weight | 1000 kg, continuous, weld free |
| Coil outer diameter | 1200 mm +/- 50 mm |
| Coil inner diameter | 500 mm or 610 mm |
| Wire diameter | 2.5 mm / 3.0 mm / 3.5 mm / 4.0 mm |
| Diameter tolerance | +/- 0.05 mm |
| Zinc coating | 60, 120, 240 or 260 g/m2 |
| Tensile strength | 380 - 520 MPa |
| Elongation | 12% - 15% |
| Winding | Layer wound, tension controlled, no welds |
| Packing | Pallet saddle, VCI paper, plastic film, steel strap |
The economics are simple. On a typical chain link line, coil changes and re-threading account for a measurable share of lost machine hours; a 1000 kg coil removes most of them and also reduces the number of cut-off ends, which are scrap. Fewer coil ends also mean fewer joints in the finished mesh roll, and joints are what buyers reject at final inspection. The format does require a dereeler rated for the weight and a loading plan that keeps the coil round in transit, so we supply a simple coil saddle drawing with the order and confirm container stacking with the freight forwarder before loading.
Quality ControlCoils are weight checked on a calibrated platform scale, dimensionally checked for outer and inner diameter and for winding quality, and examined for welds, kinks and cross-overs. Wire samples from the head, middle and tail are tested for diameter, tensile, elongation, coating mass and adhesion. A payoff trial on a test dereeler is run for new customers or new coil formats so any winding issue is discovered before the container leaves, not at the customer's machine.
Packing and DeliveryEach coil sits in a formed pallet saddle, wrapped in VCI paper and plastic film, and secured with at least four steel straps; coils are loaded upright and braced to prevent rolling. A 20 foot container holds about 25 tons, meaning 24 - 25 coils of this size with careful stowage. Lead time is 20 days after deposit for heavy zinc options and 15 days for standard 60 g/m2. We provide a loading plan and container photo record with the shipping documents.
| MOQ: | 10 tons |
| Price: | USD 790 - 950 per ton FOB Tianjin |
| Standard Packaging: | VCI anti-rust paper, plastic film, hessian cloth, wooden pallet, steel strap |
| Delivery Period: | 15 - 20 days after deposit |
| Payment Method: | T/T 30% deposit, balance against B/L copy; L/C at sight accepted |
| Supply Capacity: | 3000 tons per month |
A chain link weaving line stops every time a coil runs out, and on a machine producing 2.5 mm mesh the changeover plus re-threading can cost fifteen to twenty minutes. Big coil galvanized wire wound as a single 1000 kg continuous length at 1200 mm outer diameter cuts that downtime by a factor of five compared with 100 kg coils, which is why fence factories running double shift ask for this format specifically. The requirement is not just weight: the coil has to be wound without welds, without cross-overs, and with a consistent tension so the payoff does not slap or birdsnest at speed.
We wind these coils on a tension controlled layer winder, weld free across the full 1000 kg, and check the payoff behaviour on a sample before the lot is released. Wire diameter is held to +/- 0.05 mm across the length because a drift at the last 200 kg will show up as a mesh width change that the machine cannot compensate for.
Key Features| Parameter | Specification |
|---|---|
| Coil weight | 1000 kg, continuous, weld free |
| Coil outer diameter | 1200 mm +/- 50 mm |
| Coil inner diameter | 500 mm or 610 mm |
| Wire diameter | 2.5 mm / 3.0 mm / 3.5 mm / 4.0 mm |
| Diameter tolerance | +/- 0.05 mm |
| Zinc coating | 60, 120, 240 or 260 g/m2 |
| Tensile strength | 380 - 520 MPa |
| Elongation | 12% - 15% |
| Winding | Layer wound, tension controlled, no welds |
| Packing | Pallet saddle, VCI paper, plastic film, steel strap |
The economics are simple. On a typical chain link line, coil changes and re-threading account for a measurable share of lost machine hours; a 1000 kg coil removes most of them and also reduces the number of cut-off ends, which are scrap. Fewer coil ends also mean fewer joints in the finished mesh roll, and joints are what buyers reject at final inspection. The format does require a dereeler rated for the weight and a loading plan that keeps the coil round in transit, so we supply a simple coil saddle drawing with the order and confirm container stacking with the freight forwarder before loading.
Quality ControlCoils are weight checked on a calibrated platform scale, dimensionally checked for outer and inner diameter and for winding quality, and examined for welds, kinks and cross-overs. Wire samples from the head, middle and tail are tested for diameter, tensile, elongation, coating mass and adhesion. A payoff trial on a test dereeler is run for new customers or new coil formats so any winding issue is discovered before the container leaves, not at the customer's machine.
Packing and DeliveryEach coil sits in a formed pallet saddle, wrapped in VCI paper and plastic film, and secured with at least four steel straps; coils are loaded upright and braced to prevent rolling. A 20 foot container holds about 25 tons, meaning 24 - 25 coils of this size with careful stowage. Lead time is 20 days after deposit for heavy zinc options and 15 days for standard 60 g/m2. We provide a loading plan and container photo record with the shipping documents.